2017
YAMAL LNG is an integrated project encompassing natural gas production, liquefaction and shipping. The Project consists of construction of a liquefied natural gas (LNG) plant with an output capacity of around 16.5 million tons per year, using the South Tambey Field as a resource base. The field’s proven and probable reserves, by PRMS standards, are estimated at 926 billion cubic meters.  Extensive transportation infrastructure is being built in the scope of the Project, including a sea port and the Sabetta Airport.